Stephen P. Blake, P. E.

                                                                       604 Irene Court

                                                             Jacksonville, Florida 32259

                                                                        904-887-0950

 

EXPERIENCE

 

(4/02-present)    Workplace Management Inc., Jacksonville, FL

           

-           Earned LEAN Six Sigma Black Belt Certification (4/10).

-           Five-time Guest Speaker for IT Project Management class (Florida State College).

-           Provide project monitoring/assurance services as well as consolidated

documentation for small- and medium-sized businesses on a contract basis.

-           Collaborate with SMB’s to plan/produce tangible tools for use in organizational

alignment, work process mapping/troubleshooting, and skill set management.

 

(1/07-10/09)       Jacksonville (FL) Transportation Authority – Facilities Engineer

 

-           Completed numerous technical specifications, installation drawings, and bid packages.

-           Managed construction of JTA Skyway and Facilities major projects, including paving, fencing,

            emergency generator/ats, new/existing building installation/renovations, guideway repairs,

            HVAC control systems, and power distribution studies/transformer change-outs.

 

(5/04-7/05)         Trane/American Standard, Jacksonville, FL –Turnkey Project Manager

 

-           Managed all aspects of turnkey and building automation projects.

-           Completed a corporate-leveraged Six Sigma project for change orders.

 

(9/99-4/04)         Randstad, Jacksonville, FL – JEA Energy Conservation Project Manager

 

-           Managed Customer Technical Services projects for utility including COJ Energy Program,

            NASJAX FEDS Energy Conservation, and Navy power line protection.

-           Completed change management project and earned SS Greenbelt certificate (12/03).

-           Managed Information Grid projects including Data Ctr. UPS and Call Ctr. Voice Recorder.

-           Provided field assistance for JEA Chilled Water Plant construction at Hogan’s Creek,

            including daily photos, safety issues, and concrete scheduling.

-                      Managed standby generator procurement and installation program for two years.

-                      Coordinated all aspects of relocating 360 employees due to reorganization.

-                      Trained employees in Oracle requisitioning, receiving, and expediting.

-                      Administered multiple large facility additions and office space reconfigurations.

-                      Specified construction finishes, off-site storage, renovation, and CM RFQ’s.

-                      Compiled JEA Building Operations Standards for various areas.

 

(4/99-9/99)         W. W. Gay Mechanical Contractor Inc., Jacksonville, FL – Project Manager

 

-           Served as on-site Project Manager at JEA – downtown Jacksonville, FL.

-           Coordinated various building floor renovations using modular furniture.

 

(8/98-4/99)         First Coast Contractors, Jacksonville, FL - Estimator/Scheduler

           

-           Performed material take-offs and install estimates for government HVAC jobs.

-           Compiled Suretrak and MS-Project schedules for turnkey contracts.

 

(5/97-4/99)         Beloit Corporation, Jacksonville, FL - Estimator/Scheduler

 

-           Compiled and maintained EPC schedules using Primavera P3 software.

-           Developed various types of cost estimates for pulp and paper installations.

-           Organized a detailed turnkey “RESMAT” responsibility matrix for estimates/proposals.

 

 

 

 

 

 

                                                                            -2-                                                                Blake

 

(5/97-4/99)         Beloit Corporation, Jacksonville, FL - Estimator/Scheduler (cont.)

 

-           Researched global labor productivity/wage information, member of AACE (cost estimating)

            organization, and represented our group, producing product logic rules for the award-winning

            corporate Navigator estimating/proposal program.

-                      Selected, purchased, and implemented Winestimator estimating software, configuring 100+

-                      assemblies and a functional work breakdown structure.

-           Designed a project engineering, procurement, and installation tracking relational database

            Model that links cost control, installation, motors, process equipment, power equipment,

            document control, procurement, instruments, line list, valves, wiring (both electrical and

            instrumentation), schedule dates, and scope management with relationships that “cascade”

            all data table changes instantaneously.

-           Created “interim” estimating spreadsheet covering the CSI 16 divisions plus engineering,

            featuring EPC pricing capability utilizing a unit price structure.

-           Assembled the “Scopeman” questionnaire for EPC scope management, which augments an

            estimate’s plot plan, responsibility, and specification information.

 

(11/92-4/97)       Kamtech Inc., Glens Falls, NY - EPC Estimator/Project Coordinator

 

-           Took-off and estimated total installed costs of industrial turnkey projects.

-           Field engineered, procured, and executed construction project work orders.

-           Managed site subcontractors from scheduling through final payment.

-           Purchased and approved invoices of "spot" items needed for system completion.

-           Coordinated engineering activity and reported progress as Kamyr/Kamtech liaison.

-           Conducted shop visits to expedite piping and structural construction materials.

-           Compiled and updated schedules and budgets using Primavera FH/Quattro Pro.

-           Standardized 15 work processes by creating flow sheets and management tools.

 

(5/89-11/92)       ES&E Industrial Process Group, Greenville, SC - Project Administrator

 

-           Developed and used a procurement system for a $14MM turnkey lime kiln project.

-           Moderated contractor pre-bid and proposal review meetings for the customer.

-           Reviewed approval drawings to formalize design changes and information requests.

-           Managed reproduction, distribution, and quality control of bid packages and RFQ's.

 

(2/87-2/89)         MSI Construction, West Columbia, SC - Corporate Engineer

 

-           Site managed the execution of 180 field extras for the Ridgeway Gold Project.

-           Field engineered pipe routing and structural fit-up solutions for Mack Truck Project.

-           Estimated and successfully proposed multi-craft / subcontract types of projects.

 

(3/86-9/86)         CPC-Rexcel, Hudson, NC - QC/Project Engineer

 

-           Reduced rejects 20% by implementing operator self-checks to monitor quality.

-           Promoted from Production Supervisor (4/86), where managed production of 12

            polystyrene cup and lid machines, including preliminary machine troubleshooting.

 

(8/84-2/86)         Law Engineering, Charlotte, NC - Metals/Mechanical Engineer

 

-           Updated a FORTRAN computer program using Basic and WordStar to accurately

            depict tube bundle configurations coded for any defects, now used extensively.

-           Prepared testing proposals, analyzed material failures, and assisted with non-destructive

            evaluations (ET, MT, PT, RT, and UT) of various system components.

 

EDUCATION           Duke University, Durham, NC - B.S. in Mech. Engineering (9/84)

 

INTERESTS            Scuba, Golf, Bowling, Chess, Sudoku, and Mozart Piano Concerti